PLACEHOLDER This view shows what shop-floor MES would look like — vendor selection deferred · Tulip · iBASEt Solumina · 42Q · or custom-on-NS
Station STA-INTEG-A
MR
M. Rodriguez · Tech III
Home · NS MRPWO-2027-001-FINALSAT-001 · Stage 4 of 9 · Bus integration ← NS Work Orders → NS Items (serials) → NS Procurement (POs) → Arena BOM → Arena QMS (NCRs)
If selected, this view would render in:
⌘ Tulip
▣ iBASEt Solumina
42Q
⊞ Custom on NS WIP
⚠ NONE SELECTED · TBD

Production Stages · SAT-001

Today 2026-05-04 · LRD 2027-12-01 · Stage 4 of 9 · 36% complete
Stage 1
Receiving
Kitting · QA inspect
✓ 2025-12-15
Stage 2
Sub-assembly
Boards · harnesses
✓ 2026-02-28
Stage 3
Subsystem integ
EPS · ADCS · COMM
✓ 2026-04-22
Stage 4
Bus integration
Mate to structure
Stage 5
Functional test
Power-on · loopback
Q3 2026
Stage 6
Environmental
Vibe · TVAC · EMI/EMC
Q1 2027
Stage 7
Final assembly
Solar arrays · MLI
Q2 2027
Stage 8
Acceptance
Buy-off · DCMA signoff
Q3 2027
Stage 9
Ship to launch
LV mate · LRD
2027-12-01
📋 Active Work Order IN PROGRESS
WO #WO-2027-001-FINAL
Build itemSAT-001 (Bus integ phase)
Quantity1 unit · serial SN-001
RoutingSAT-RTG-INTEG (12 ops)
ProjectPROJ-ANDROMEDA-SAT-001
Released byNetSuite MRP · 2026-05-01
Need date2027-09-01
Today's progress5 of 12 ops · 42%
Source BOM revArena Rev A · ECO-2026-0142 applied
👷 Operator · Station ACTIVE
OperatorM. Rodriguez · Tech III
BadgeEMP-1142
Cert · ESD✓ Current
Cert · Soldering J-STD-001✓ Current
Cert · Crimping✓ Current
StationSTA-INTEG-A
Clean roomClass 100,000 · ISO 8
Started shift07:30 · 4h 12m on op
📦 Materials issued · this op 5 items
PartQtySerial / LotFrom PO
ADCS-RW-MEDIUM-A 4 BCT-RW-2026-{0142,0143,0144,0145} PO-2026-1148
ADCS-RW-MOUNT-BRKT 4 LOT-2026-04-A33 (Make · in-house)
STR-FASTENER-M4-TI 16 LOT-2026-03-T1102 PO-2025-2049
EPS-HARNESS-PWR-MAIN 1 HARNESS-001-RevA (Make · in-house)
TCS-INTERFACE-FILLER 1 tube NUSIL-CV-2289-LOT-22 PO-2026-0978
🔧 Routing · 12 operations · Bus integration 5 of 12 complete
Op 010 · Receive structure assembly from sub-assy
Mate STR-PANEL-TOP/BOT/SIDE · verify torque per drawing 5318-A
PASS M. Rodriguez
2.5h actual
3h est
Op 020 · Install equipment brackets
12× STR-BRACKET-EQUIP-A · 8× STR-BRACKET-EQUIP-B · torque per spec
PASS M. Rodriguez
4h actual
5h est
Op 030 · Install EPS subsystem to structure
Mount PCDU · battery pack · MPPT · main power harness
PASS M. Rodriguez Photo: ✓ recorded
8h actual
8h est
Op 040 · Install CDH subsystem · OBC + mass memory
Mount CDH-OBC-MAIN-A · CDH-OBC-BACKUP-A · mass storage · LVDS harness
PASS M. Rodriguez Photo: ✓ recorded
5h actual
6h est
Op 050 · Install COMM subsystem · S-band TT&C + X-band downlink
Mount radios · waveguide · diplexer · RF harness routing
PASS w/ NCR M. Rodriguez NCR-2026-014 · ferrite bead delta
9h actual
7h est
5
Op 060 · Install ADCS reaction wheels · 4× to mounting brackets
4× ADCS-RW-MEDIUM-A · torque to spec 8.5 N·m · serial-record per wheel · IMU placement check
⚡ IN PROGRESS M. Rodriguez ITAR
4h 12m
5h est
6
Op 070 · Install ADCS star trackers · 2× redundant
2× ADCS-STAR-TRACKER-A · co-align with payload optical axis · cover until cleanroom exit
4h est
7
Op 080 · Install propulsion subsystem
Tank · 4× thrusters · valves · plumbing · NDE inspect welds · pressure test 1.25× MEOP
12h est
8
Op 090 · Install thermal control · MLI · heaters · thermistors
12× MLI blankets · 30× heaters · 40× thermistors · routing per drawing 5318-T
14h est
9
Op 100 · Install payload assembly
Telescope · FPA · electronics · co-align with star trackers · contamination control
16h est
10
Op 110 · Final harness routing + tie-down
Route all subsystem harnesses · clamp + lace · continuity check before close-out
8h est
11
Op 120 · Mass properties measurement
Mass · CG · MOI per axis · log to budget tracker · feed Arena update
3h est
12
Op 130 · WO close-out · pre-test buyoff
QA review · all NCRs dispositioned · sign-off → release to functional test (Stage 5)
2h est
🧪 In-process test results · this op 3 PASS · 0 FAIL
RW1 mounting torque · M4 bolts ×4
8.45–8.62 N·m
✓ PASS
spec 8.5 ±0.3
RW1 alignment · pitch axis
0.04°
✓ PASS
spec ≤0.1°
RW2 mounting torque
8.51 N·m
✓ PASS
spec 8.5 ±0.3
RW3 mounting torque
pending
in progress
RW4 mounting torque
pending
in progress
🌳 Pedigree / Genealogy SN-001
📦 SAT-001 · SN-001 · Rev A
EPS-ASSY · sub SN-EPS-001
EPS-PCDU-250W · AAC-PCDU-22405
EPS-BATTERY-LIION-100W · EP-BAT-91842
CDH-ASSY · sub SN-CDH-001
CDH-OBC-MAIN-A · CAES-OBC-7714
CDH-OBC-BACKUP-A · CAES-OBC-7715
COMM-ASSY · sub SN-COMM-001
COMM-RADIO-XBAND-A · TESAT-XR-441
ADCS-ASSY · in progress
ADCS-RW-MEDIUM-A × 4 · BCT serials being recorded
PROP-ASSY · queued (Op 080)
TCS-ASSY · queued (Op 090)
PAY-ASSY · queued (Op 100)
Each leaf links back to the source PO + receipt + AML-qualified MFR · this is the audit chain DCMA + customer acceptance team will demand.
⚠ NCRs raised on this WO 2 · 1 open · 1 dispositioned
NCR-2026-014
COMM-RF-AMP-XBAND ferrite bead spec mismatch · part received pre-ECO-2026-0142
Op 050 · raised by M. Rodriguez · disposition: USE-AS-IS for SN-001 · ECO applies SAT-002+
Closed · use-as-is
NCR-2026-018
EPS harness · 1× M3 fastener mis-torqued (re-torqued · within window)
Op 030 · raised by QA · disposition: PASS after rework
Closed · pass
📤 What MES pushes back · on WO close-out
→ NetSuite (Manufacturing module)
  • WO completion · materials consumed · labour hours
  • Finished good SN-001 into inventory
  • Project costs roll up to PROJ-ANDROMEDA-SAT-001
  • Trigger ARM revenue rec · units-of-production milestone
→ Arena PLM (QMS workspace)
  • NCR-2026-014 · ferrite bead disposition · CAPA loop if pattern
  • As-built deviation list · what differs from BOM rev A
  • Mass properties update · feed mass budget tracker
  • Trigger CAPA in Arena QMS · ECO if design fix needed